| |
Mar 14, 2026
|
|
|
|
|
University of Alberta Calendar 2017-2018 [ARCHIVED CALENDAR]
|
PET E 475 - Applied Reservoir Engineering ★ 3.8 (fi 8) (either term, 3-3s/2-0) Reserves estimation. Analysis and prediction of reservoir performance by use of material balance. Primary recovery performance for water influx and solution gas drive reservoirs. Decline curve analysis. Basics of well test analysis. Pressure drawdown and buildup tests. Average reservoir pressure estimation. Drill stem testing and gas well testing. Prerequisite: PET E 373.
|
|